ABOUT US

INFRASTRUCTURE

ACADEMIC

ACHIEVEMENT

MIGRATION

AUDIT

RESULT

ADMISSION

FACILITY

ACTIVITIES

HOME

  PRINCIPAL LIST  |  NEWS & EVENTS   |   RTI   |   SCHOOL CALENDAR   |   STAFF  |  STAFF STRENGTH  |   STUDENT STRENGTH   |   ALUMNI   

 
 
Welcome to Jawahar Navodaya Vidyalaya, Churhat Sidhi(M.P.)
  Infrastructure:

STATUS OF INFRASTRUCTURE IN JNV’S

 


I

Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on 

: 30 Acres
: YES
: YES

ii

Status of Boundary Wall
a. Brick Wall
b. Barbed wire fencing 

 

: Completed
: Yet to be Completed

iii

Permanent buildings constructed 

: CBRI pattern

iv

School building 

: Completed

v

Dormitories

: Boys Nos. 04
Boys 96  & CBRI  CPWD Pattern Completed
with Warden Residence - Nil

 

 Dormitories

: Girls 172 Nos. 03
with Warden Residence - Nil

vi

Kitchen/dining Hall
No. of shifts required for all students to take food 

: 1. Two Dining Hall Completed
 : In One Go

vii

Principal Residence 

: 01 No.

viii

Staff Quarters

 

: Type III = 16 Nos.
Type II = 12 Nos.
Type I = 12 Nos.
SP Sheds converted into Staff Qrs.: Nil.

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank
Its capacity
Present Status

: Column based
: 1,35 K. litres
: Working satisfactory

xii

U.G. tank
Its capacity
Present Status


: 1,35 K litres
: Working satisfactory

xiii

D.G. Set

 

: Available
: KiRLoskar make
: 10 KV & 25 KVA
: Working
: Year of procurement - 1995 & 2011

xiv

Sewage Pump

: Nil

xv

Water Pump

01: - 7.5 HP - 01
02: - 05 HP – 01
03. 1.05.HP – 04
(Mono Block) – 7.5 HP - 02 No.s

xvi

Electrification
Electric connection
Sub Station building
Street lighting
Numbers of hrs. during day when power supply is available on an average.

 
: Urban
: Completed
: 30 Nos. of Poles
: 10 Hrs.

xvii

Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court

 

: Area of 95 x 100 Mtrs is Transferred from Forest land for  development of Play field.
: 02 Nos. – Available
: 01 Nos. – Available

xviii

Water supply
Tube Well
Hand pump
Connection from PHED 

RO system is installed but not functioning due to exces of Calcium.
: Potable, 05 Nos.- working
: Potable, 05 Nos.- working
: Nil  - hours supply in a day

ix

Rajiv Gandhi Smriti Van

: Available

xx

Fire fighting arrangement

: Available

xxi

Last date of cleaning of
(a) Septic tank
(b) Water tanks



: 10.06.2011
: 28 May, 2011

xxii

Whether area around transformer is fenced

: No

xxiii

Whether open wells, if any, are covered from top

: -N/. A. -

xxiv

Works taken up under M&R fund during current year and last year: -

:

Year

Name of work (M&R)

Expenditure
(Rs. In lacs)

Cumulative expenditure during the year

2010-11

W/wash / painting.

 

 

 

Repairs/Replacement of doors

 

 

Repairs /Replacement of sanitary fittings etc.

 

Repairs /Replacement Supply fittings

 

Purchase of Electrical Items etc.

 

Electrical works

 

Replacement of broken glasses

 

Cleaning campus OHT, Sep. tank

 

Other Repair works

 

Total =

 


 

Details of vehicle provided to the Vidyalaya

(i)

Whether vehicle is provided or not (Yes/No)

YES

(ii)

Description to vehicle.

Mini Bus 17 Seater

(iii)

Model no and date of purchase.

Mahendra Pickup S-4 27.04.1993

(iv)

Present condition of the Vehicle. 

Liable to be Condemned

HOME    CONTACT US  FEED BACK

 

 Website Designed and Maintaining By  Vindhya Group Technologies Rewa (M.P.)
Best Viewed in 800 x 600 resolution